교수소개

교수

김병수
직책/직급
교수
주전공
생산계획 및 통제, 물류최적화 및 SCM, 시뮬레이션
담당과목
생산통제, 생산계획, 공급망관리, 최적화모델링응용
전화번호
032-835-8482
이메일
bskim@inu.ac.kr
홈페이지
https://sites.google.com/view/ipscmlab
학력

2009.12.18 Auburn Univ.  (공학박사)

2004.08.05 Auburn Univ.  (공학석사)

2000.02.25 부경대학교  (공학석사)

1998.02.26 부경대학교  (공학사)

경력

-

연구실적
<논문> 

Vehicle routing and scheduling problem with order acceptance for pharmaceutical refrigerated logistics, APPLIED SOFT COMPUTING , 제164권(집) , 2024.10.01

고객 정보 공유를 고려한 지속가능 렌탈 서비스 기업의 방문 서비스원 경로 계획, 대한산업공학회지 , 제50권(집) , 제5호 , PP.291~303 , 2024.10.01

Iterated variable neighborhood search for integrated scheduling of additive manufacturing and multi-trip vehicle routing problem, COMPUTERS & OPERATIONS RESEARCH , 제167권(집) , 2024.07.01

Particle swarm optimization for integrated scheduling problem with batch additive manufacturing and batch direct-shipping delivery , COMPUTERS & OPERATIONS RESEARCH , 제161권(집) , 2024.01.01

Two-stage meta-heuristic for part-packing and build-scheduling problem in parallel additive manufacturing, APPLIED SOFT COMPUTING , 제136권(집) , 제0호 , 2023.03.01

Population-Based Meta-Heuristic Algorithms for Integrated Batch Manufacturing and Delivery Scheduling Problem, Mathematics , 제10권(집) , 제21호 , 2022.11.01

Batch loading and scheduling problem with processing time deterioration and rate-modifying activities, INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH , 제60권(집) , 제5호 , PP.1600~1620 , 2022.03.04

Part‑grouping and build‑scheduling with sequence‑dependent setup time to minimize the makespan for non‑identical parallel additive manufacturing machines, INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY , 제119권(집) , 제3-4호 , PP.2247~2258 , 2022.03.01

A Three-Stage ACO-Based Algorithm for Parallel Batch Loading and Scheduling Problem with Batch Deterioration and Rate-Modifying Activities, Mathematics , 제10권(집) , 제4호 , 2022.02.20

Coordination supply chain management under flexible cleaner production system and stochastic conditions, ANNALS OF OPERATIONS RESEARCH , 2022.01.01

Production-Inventory control model for a supply chain network with economic production rates under no shortages allowed, COMPUTERS & INDUSTRIAL ENGINEERING , 제160권(집) , 2021.10.01

A multi-constrained supply chain model with optimal production rate in relation to quality of products under stochastic fuzzy demand, COMPUTERS & INDUSTRIAL ENGINEERING , 제149권(집) , 2020.11.01

EFFECT OF ELASTIC MODULUS OF SANDS ON THE P-Y RELATIONSHIP OF OFFSHORE WIND TURBINE MONOPILE, ICIC Express Letters, Part B: Applications , 제11권(집) , 제5호 , PP.517~524 , 2020.05.01

NUMERICAL ANALYSIS OF BEHAVIOR OF HELICAL PILE WITH SINGLE HELIX VARYING HELIX LOCATIONS, ICIC Express Letters, Part B: Applications , 제11권(집) , 제3호 , PP.253~260 , 2020.03.02

A Constrained Production System Involving Production Flexibility and Carbon Emissions, Mathematics , 제8권(집) , 제2호 , 2020.02.19

Variable Neighborhood Search Algorithms for an Integrated Manufacturing and Batch Delivery Scheduling Minimizing Total Tardiness, Applied Sciences-Basel , 제9권(집) , 제21호 , 2019.11.04

제조와 배치배송이 결합된 일정계획을 위한 VNS 알고리즘의 탐색효율에 관한 연구, 한국SCM학회지 , 제19권(집) , 제2호 , PP.145~154 , 2019.10.01

A genetic algorithm-based matheuristic for hydrogen supply chain network problem with two transportation modes and replenishment cycles, COMPUTERS & INDUSTRIAL ENGINEERING , 제127권(집) , PP.981~997 , 2019.01.01

REAL-TIME HOIST SCHEDULING WITH A REDUCED BRANCH-AND-BOUND ALGORITHM, ICIC Express Letters, Part B: Applications , 제9권(집) , 제12호 , PP.1287~1294 , 2018.12.01

Two-Stage Assembly Scheduling with Batch Setup Times, Time-Dependent Deterioration, and Preventive Maintenance Activities Using Meta-Heuristic Algorithms, MATHEMATICAL PROBLEMS IN ENGINEERING , 2018.12.01

Matheuristic approaches for parallel machine scheduling problem with time-dependent deterioration and multiple rate-modifying activities, COMPUTERS & OPERATIONS RESEARCH , 제95권(집) , PP.97~112 , 2018.07.01

A study on the effect of setup time of variable neighborhood search in two-stage assembly flow shop scheduling problem, International Journal of Innovative Computing, Information and Control , 제14권(집) , 제3호 , PP.1151~1157 , 2018.06.01

Batch delivery scheduling of trucks integrated with parallel machine schedule of job orders from multi-customers, Journal of Advanced Mechanical Design Systems and Manufacturing , 제12권(집) , 제2호 , 2018.04.01

A STUDY ON A SUPPLY CHAIN NETWORK CONTROL PROBLEM WITH AN INDEPENDENT REPLENISHMENT CYCLE POLICY UNDER INVENTORY COORDINATION, ICIC Express Letters , 제12권(집) , 제4호 , PP.353~359 , 2018.04.01

Affinely Adjustable Robust Model for Multiperiod Production Planning Under Uncertainty, IEEE TRANSACTIONS ON ENGINEERING MANAGEMENT , 제64권(집) , 제4호 , PP.505~514 , 2017.11.01

A rule-based genetic algorithm with an improvement heuristic for unrelated parallel machine scheduling problem with time-dependent deterioration and multiple rate-modifying activities, COMPUTERS & INDUSTRIAL ENGINEERING , 제109권(집) , PP.179~190 , 2017.06.01

Rule-based meta-heuristics for integrated scheduling of unrelated parallel machines, batches, and heterogeneous delivery trucks, APPLIED SOFT COMPUTING , 제53권(집) , 제1호 , PP.457~476 , 2017.04.01

Two-stage assembly scheduling problem for processing products with dynamic component-sizes and a setup time, COMPUTERS & INDUSTRIAL ENGINEERING , 제104권(집) , 제1호 , PP.98~113 , 2017.01.01

Novel mathematical models for two-stage assembly flow shop scheduling problem with deterioration and preventive maintenance activities, ICIC Express Letters, Part B: Applications , 제7권(집) , 제11호 , PP.2477~2482 , 2016.11.01

A study on identical parallel machine scheduling with deterioration and rate-modifying activieitis, ICIC Express Letters Part B: Applications , 제7권(집) , 제10호 , PP.2117~2122 , 2016.10.01

A hybrid genetic algorithm with two-stage dispatching heuristicfor a machine scheduling problem with step-deteriorating jobs andrate-modifying activities, COMPUTERS & INDUSTRIAL ENGINEERING , 제98권(집) , PP.113~124 , 2016.05.17

Optimization-based approach for strategic designand operation of a biomass-to-hydrogen supplychain, INTERNATIONAL JOURNAL OF HYDROGEN ENERGY , 제41권(집) , 제12호 , PP.5405~5418 , 2016.03.08

A hybrid genetic algorithm to design the hydrogen supply chain network with multi-transportation modes, ICIC Express Letters , 제10권(집) , 제3호 , PP.541~546 , 2016.03.01

Optimization-based planning of a biomass to hydrogen (B2H2) systemusing dedicated energy crops and waste biomass, BIOMASS & BIOENERGY , 제87권(집) , PP.144~155 , 2016.03.01

Genetic Algorithms for an Integrated Problem of Batch Production and Truck Delivery Scheduling with a Single Truck, ICIC Express Letters , 제10권(집) , 제1호 , PP.9~14 , 2016.01.01

A Real Time Temperature Monitoring System for Plating Process, 산업경영시스템학회지 , 제38권(집) , 제4호 , PP.72~79 , 2015.12.01

How anthropometric dimensions of the thumb affect mobile touch interactions, ICIC Express Letters , 제9권(집) , 제11호 , PP.3121~3126 , 2015.11.02

Hybrid genetic algorithms with dispatching rules for unrelated parallelmachine scheduling with setup time and production availability, COMPUTERS & INDUSTRIAL ENGINEERING , 제85권(집) , PP.102~109 , 2015.07.01

Genetic Algorithms for a Multi-product Dynamic Lot-sizing and Dispatching Problem with Delivery Time Windows and Multi-vehicle Types, 대한산업공학회지 , 제41권(집) , 제3호 , PP.233~242 , 2015.06.30

Scheduling Trucks in Multi-Door Cross DockingSystems: An Adaptive Genetic Algorithmwith a Dispatching Rule, ASIA-PACIFIC JOURNAL OF OPERATIONAL RESEARCH , 제32권(집) , 제3호 , PP.1~20 , 2015.06.01

Carton assignment heuristics for a zone-based pick-to-light distribution center, ICIC Express Letters, Part B: Applications , 제6권(집) , 제4호 , PP.997~1002 , 2015.04.01

Machine scheduling of time-dependent deteriorating jobs withdetermining the optimal number of rate modifying activitiesand the position of the activities, Journal of Advanced Mechanical Design Systems and Manufacturing , 제9권(집) , 제1호 , PP.1~12 , 2015.03.09

Minimizing Makespan for Non-Identical Parallel Machine with Sequence Dependent Setup Times, ICIC Express Letters , 제9권(집) , 제2호 , PP.525~530 , 2015.02.02

A Stock Pre-positioning Model to Maximize theTotal Expected Relief Demand of Disaster Areas, Industrial Engineering & Management Systems , 제13권(집) , 제3호 , PP.297~303 , 2014.10.01

단일 복구조정활동 하에 단계적 퇴화를 가지는 단일기계 생산일정계획, 산업경영시스템학회지 , 제37권(집) , 제3호 , PP.43~50 , 2014.10.01

생산정보를 이용한 자동차 조립 서열시스템에 관한 연구, 산업경영시스템학회지 , 제37권(집) , 제3호 , PP.8~15 , 2014.10.01

제3자 물류센터 납품시간창 디스패칭 정책에 관한 효과, 산업경영시스템학회지 , 제37권(집) , 제1호 , PP.60~67 , 2014.03.31

Block transportation scheduling under delivery restriction in shipyardusing meta-heuristic algorithms, EXPERT SYSTEMS WITH APPLICATIONS , 제2014권(집) , 제41호 , PP.2851~2858 , 2013.12.12

Stock Pre-positioning Model with Unsatisfied Relief Demand Constraint to Support Emergency Response, OPERATIONS AND SUPPLY CHAIN MANAGEMENT , 제6권(집) , 제2호 , PP.103~110 , 2013.10.15

Scheduling a single machine with multiple preventivemaintenance activities and position-based deteriorationsusing genetic algorithms, INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY , 제67권(집) , PP.1127~1137 , 2013.08.30

복구조정 활동과 복구조정 후 시간경과에 따라 퇴화하는 작업시간을 갖는 단일기계의 일정계획에 관한 연구, 경영과학 , 제30권(집) , 제1호 , PP.15~24 , 2013.03.31

A MULTI-PRODUCT DYNAMIC INBOUND ORDERING AND SHIPMENT SCHEDULING PROBLEM AT A THIRD-PARTY WAREHOUSE, INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING-THEORY APPLICATIONS AND PRACTICE , 제20권(집) , PP.36~46 , 2013.03.01

Genetic algorithms for single machine scheduling with time-dependent deterioration and rate-modifying activities, EXPERT SYSTEMS WITH APPLICATIONS , 제40권(집) , 제8호 , PP.3036~3043 , 2013.02.01

Scheduling compound trucks in multi-door cross-docking terminals, INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY , 제64권(집) , PP.977~988 , 2013.01.01

Genetic algorithms for door-assigning and sequencing of trucks at distribution centers for the improvement of operational performance, Expert Systems with Applications , 제39권(집) , 제17호 , PP.12975~12983 , 2012.12.01

작업순서와 기계 의존적인 작업준비시간을 고려한 이종병렬기계의 일정계획을 위한 효과적인 작업할당 방법을 이용한 유전알고리즘, 산업공학(IE interfaces) , 제25권(집) , 제3호 , PP.357~364 , 2012.09.01

Meta-heuristic algorithms for a multi-product dynamic lot-sizing problem with a freight container cost, Industrial Engineeering & Management Systems , 제11권(집) , 제3호 , PP.288~298 , 2012.09.01

Non-Identical Parallel Machine Scheduling with Sequence and Machine Dependent Setup Times Using Meta-Heuristic Algorithms, Industrial Engineeering & Management Systems , 제11권(집) , 제1호 , PP.114~122 , 2012.03.01

Slotting methodology using correlated improvement for a zone-based carton picking distribution system, COMPUTERS INDUSTRIAL ENGINEERING , 제62권(집) , 제1호 , PP.286~295 , 2012.02.01

Ant colony optimisation with random selection for block transportation scheduling with heterogeneous transporters in a shipyard, INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH , 제50권(집) , 제24호 , PP.7229~7241 , 2012.01.01

A genetic algorithm for dynamic inbound ordering and outbound dispatching problem with delivery time windows, ENGINEERING OPTIMIZATION , 제44권(집) , 제7호 , PP.859~874 , 2012.01.01

Parallel machine scheduling problem with ready times, due times and sequence-dependent setup times using meta-heuristic algorithms, ENGINEERING OPTIMIZATION , 제44권(집) , 제9호 , PP.1021~1034 , 2012.01.01

Single-Machine Total Completion Time Scheduling with Position-Based Deterioration and Multiple Rate-Modifying Activities, Industrial Engineeering & Management Systems , 제10권(집) , 제4호 , PP.247~254 , 2011.12.01

작업시간창이 주어진 크로스토킹 터미널에서 미 선적 물량 최소화를 위한 입출고 트럭 일정계획, 대한산업공학회지 , 제37권(집) , 제4호 , PP.342~349 , 2011.12.01

다종의 차량과 납품시간창을 고려한 동적 로트크기 결정 및 디스패칭 문제를 위한 자율유전알고리즘, 대한산업공학회지 , 제37권(집) , 제4호 , PP.331~341 , 2011.12.01

유한 재생산율을 갖는 동적 구매-재생산계획문제, 한국경영공학회지 , 제16권(집) , 제3호 , PP.261~274 , 2011.11.01

다수의 도어를 갖는 크로스도킹 터미널에서 입고와 출고를 병행하는 트럭일정계획을 위한 유전알고리즘, 대한산업공학회지 , 제37권(집) , 제3호 , PP.248~257 , 2011.09.01

존 기반 카톤픽킹 배송시스템을 위한 두 단계 슬롯팅 방법, 한국경영공학회지 , 제16권(집) , 제2호 , PP.153~171 , 2011.07.01

크로스도킹 터미널에서 입고와 출고를 병행하는 트럭 일정계획에 관한 연구, 한국SCM학회지 , 제11권(집) , 제1호 , PP.15~24 , 2011.05.01

납품시간창을 고려한 동적 로트크기 결정문제를 위한 유전알고리즘, 한국생산관리학회지 , 제21권(집) , 제4호 , PP.383~398 , 2010.12.01

고장을 고려한 두 단계로 이루어진 CONWIP 생산라인에서의 최적 재공품 관리, 한국경영공학회지 , 제15권(집) , 제3호 , PP.1~13 , 2010.11.01

Puzzle-based storage systems, NAVAL RESEARCH LOGISTICS , 제54권(집) , 제5호 , PP.556~567 , 2007.08.01

Travel time model for the warehousing system with a tower crane S/R machine, COMPUTERS INDUSTRIAL ENGINEERING , 제43권(집) , 제3호 , PP.495~507 , 2002.09.01

<저서> 

생산 및 운영관리, (주) 생능출판사 , 2016.10.21